Day 5 : Summer LID Stormwater Studio

Day 5: Excavation & Rough Grading

Summer LID Stormwater Design Build Studio.

More excavation was done in the 2 rain garden pits, and the soil was rough graded to create shelves for the concrete rubble walls that contain the rain gardens.

Advertisements