Day 10: Summer LID Stormwater Studio

Day 10: Concrete Pour

Summer LID Stormwater Design Build Studio.

We poured the concrete today, filling the forms of the big circle in the main rain garden, the base for the cistern (not shown), and the cylindrical form for the base for the sign. It went quickly and relatively well, with some forms not holding up as we as we would have hoped, but it turned out for the best in the end.

Advertisements