Artists’ Backyard- Phase 1_Summer Design Build Complete

With the presentation of work and video viewed work in finally complete for Phase 1 of the Artists’ backyard.  Check out the video on the design build site:  http://ncsudesignbuild.wordpress.com/2011/08/20/28-days-in-8-minutes-the-final-video-for-the-artists-backyard_phase-1/

Or here:

Advertisements